7f. Mounted Front Fairing with Hand Guard
The hand guard after a cloth, mat, cloth structural layer plus a 3" wide seam cloth for joint carry through strength. |
|
|
Once the fiber glass has cured, all the foam has to be removed. Then a 2" wide strip of fiber glass cloth is bonded along the inside joint to provide additional strength for the attachment seam. |
|
Next we began creating the opening for the
left halogen light. Cut and fit, cut and fit. |
Final fitting of the F-18 front fairing. Bob had to rotate the handlebar to the left and right extremes while wearing his racing leather gloves to insure adequate hand and brake lever clearance. |
Side Tank - all sanded, primered and ready for final silver paint and addition of the sponsors name. |